Contribute  :  Advanced Search  :  Directory  :  Web Resources  :  Polls  
    Mickey's RV8 Site
 Welcome to Mickey's RV8 Site
 Sun, Feb 05 2012 @ 20:54 in Switzerland

Static air lines

   
FuselageI hooked up the static lines today. It was not a big deal at all, which was no big surprise. I had to use a heat gun to warm up the tubes so that I could get them on the T barbs. My shop is now about 9c, so it's time to fire up the Zibro-Kamin heaters.



What I'd like to know is if I should find a way to make the smaller tubes stick to the rivets in the fuselage that form the static air ports. I guess I could wrap a bit of safety wire around them, or perhaps a small zip tie. We'll check it out tomorrow.

Note the adel clamps (cushion clamps) in there holding the wiring. Pretty robust.
 

What's Related

Story Options

Static air lines | 0 comments | Create New Account
The following comments are owned by whomever posted them. This site is not responsible for what they say.
 Copyright © 2012 Mickey's RV8 Site
 All trademarks and copyrights on this page are owned by their respective owners.
Powered By Geeklog 
Created this page in 0.27 seconds